Employer/ Beneficiary: AGROFRUIT – Troyan EOOD Implementation period: 06/2004 – 08/2004 Design parameters: WWTP for industrial and communal wastewater from a factory for production of natural fruit pulps, clear concentrates…
Blog
FEASIBILITY STUDY FOR THE POSSIBILITIES OF WASTEWATER TREATMENT AND ASSESSMENT OF THE IMPACT FROM THEIR DISCHARGING FOR SITE SELECTION OF A SILICATE FACTORY
By delphineco0Employer/ Beneficiary: FCG POVVIK EAD Implementation period: 06/2017 – 08/2017 Design parameters: Planned production – 30 000 million tons of silicates, with the potential to increase the production in the…
Industrial WWTPWaste Water Treatment PlantsPRELIMINARY DESIGN FOR INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT FROM PAPER FACTORY – “MAYR-MELINHOF NIKOPOL” AD
By delphineco0Employer/ Beneficiary: MAYR-MELINHOF NIKOPOL AD Implementation period: 10/2009 – 11/2009 Design parameters: Treatment of mixed industrial and domestic wastewater from paper factory; Qav.d = 14 508 m³/d Performed activities: Preparation…
Industrial WWTPWaste Water Treatment PlantsTECHNICAL DESIGN, DELIVERY, CHIEF-ASSEMBLING, START-UP AND ADJUSTMENT OF WWTP FOR OBJECT: A DOOR MANUFACTURER WITH ADMINISTRATION IN THE LAND OF ELIN PELIN
By delphineco0Employer / Beneficiary: SOLID – 55 OOD Implementation period: 01/2008 – 10/2008 Design parameters: WWTP for industrial and domestic wastewater from a door manufacturing plant; Parameters of discharged treated water:…
Industrial WWTPWaste Water Treatment PlantsRECONSTRUCTION AND MODERNIZATION OF EXISTING DAIRY, NEW BOILER ROOM, LOCAL WASTE WATER TREATMENT PLANT, OFFICE BUILDING WITH TASTING ROOM AND GARAGES – STAGE IMPLEMENTATION, BELOMORTSI VILLAGE, OMURTAG MUNICIPALITY
By delphineco0Employer/ Beneficiary: DAIRY PRODUCTSEOOD Veliko Tarnovo with O.P.S and Tukan EOOD Veliko Tarnovo Implementation period: 03/2018 – 05/2018 Design parameters: Local WWTP for Industrial and Domestic wastewater from a dairy…
Industrial WWTPWaste Water Treatment PlantsTREATMENT OF RADIOACTIVELY CONTAMINATED MINE WATERS PREPARATION OF FEASIBILITY STUDY FOR CONSTRUCTION OF FACILITY FOR MANAGING AND TREATMENT OF THE CONTAMINATED WATER FROM MINE ADIT NO. 93, KREMIKOVTSIQUARTER
By delphineco0Employer/ Beneficiary: INFRAPROEKTSTROY EOOD / ENGINEERING-RM EOOD Implementation period: 06/2016 – 10/2016 Design parameters: Wastewater treatment plant for radioactively contaminated mine water with a capacity of 28 l/s. Performed activities:…
Industrial WWTPWaste Water Treatment PlantsDOMESTIC AND INDUSTRIAL WASTE WATER TREATMENT FROM THE TERRITORY OF THE MAGURA WINERY, RABISHA VILLAGE, BELOGRADCHIK MUNICIPALITY, VIDIN PROVINCE
By delphineco0Employer/ Beneficiary: Magura AD Winery Implementation period: 08/2011 – 12/2011 Design parameters: WWTP for domestic and industrial wastewater treatment from the territory of a winery; WWTP capacity – 320 PE.…
Small WWTP’sMODULAR WASTE WATER TREATMENT PLANT FOR SITE: HOUSING AND HOTEL COMPLEX BOROVETS
By delphineco0Employer/ Beneficiary: MINSTROY HOLDING AD Implementation period: 12/2005 – 03/2006 Design parameters: Modular WWTP for domestic wastewater with capacity 550 PE and average daily wastewater quantity of 82,5 m³/d; Outlet…
Small WWTP’sMODULAR WASTE WATER TREATMENT PLANT FOR BORISLAVTSI VILLAGE, MADJAROVO MUNICIPALITY, HASKOVO DISTRICT
By delphineco0Employer/ Beneficiary: MUNICIPALITY OF MADZHAROVO Implementation period: 06/2009 – 04/2014 Design parameters: Modular WWTP with capacity: – Stage I: 330 PE; – Stage II: 220 PE. Outlet flow parameters WWTP:…

