Employer/ Beneficiary: JV for the design of the dam “Luda Yana” D. Karavokiris and Associates Consulting Engineers SA, Edafos Consulting Engineers SA/ Ministry of Regional Development and Public Works Implementation…
Blog
POTABLE WATER TREATMENT PLANT FOR WATER SUPPLY SYSTEM SHOUMEN
By delphineco0Employer/ Beneficiary: “Build invest – N” EOOD/ Shumen Municipality Implementation period: 11/2016 – 09/2017 Design parameters: PWTP with capacity of 600 l/s; Pumping station for treated water; External connections: power…
FEASIBILITY STUDY ELABORATION, PREPARATION OF INVESTMENT PROJECTS (PHASE PRELIMINARY DESIGN) FOR WWTP CONSTRUCTION AND RELATED TECHNICAL INFRASTRUCTURE; PREPARATION OF INVESTMENT PROJECTS (PHASE DETAILED DESIGN) FOR THE CITY OF ELHOVO’S WATER SUPPLY AND SEWERAGE NETWORKS AND SLUDGE MANAGEMENT PLAN
By delphineco0Employer/ Beneficiary: Municipality of Elhovo Implementation period: 08/2012 – 08/2015 Design parameters: WWTP capacity of 11 100 PE, with nitrogen and phosphorus removal and discharge into a “sensitive zone” water…
CONSTRUCTION OF WWTP FOR OVER 10 000 PE, RECONSTRUCTION AND COMPLETION OF THE SEWERAGE SYSTEM FOR TOWN OF LEVSKI
By delphineco0Employer/ Beneficiary: Municipality of Levski Implementation period: 11/2012 – 02/2014 Design parameters: WWTP capacity of 12 300 PE, with nitrogen and phosphorus removal and discharge into a “sensitive zone” water…