Employer / Beneficiary: SOLID – 55 OOD
Implementation period: 01/2008 – 10/2008
Design parameters:
- WWTP for industrial and domestic wastewater from a door manufacturing plant;
- Parameters of discharged treated water:
– BOD5 ≤ 25 mg/l;
– COD ≤ 125 mg/l;
– Suspended solids ≤ 35 mg/l.
Scope of services:
- Detailed design;
- Procedures on issuance of discharge permits;
- Delivery of basic machine-technological equipment for pumping shaft and MPSOV;
- Chief-assembling, start-up, and adjustment;
- Commissioning;
- Monitoring and control, including sampling and examination of the main parameters of the wastewater at the inlet and outlet of the MWWTP.
Investment value of the project: 27 100 € (without VAT)