Employer/ Beneficiary: Magura AD Winery
Implementation period: 08/2011 – 12/2011
Design parameters:
- WWTP for domestic and industrial wastewater treatment from the territory of a winery;
- WWTP capacity – 320 PE.
Performed activities:
- Feasibility study;
- Bill of quantities by aggregate indicators;
- Determination of the investment intent;
- Preparation of documentation for a discharge permit.
Investment value of the project: 153 000 € (without VAT)