Employer/ Beneficiary: MINSTROY HOLDING AD
Implementation period: 12/2005 – 03/2006
Design parameters:
- Modular WWTP for domestic wastewater with capacity 550 PE and average daily wastewater quantity of 82,5 m³/d;
- Outlet flow parameters WWTP:
– BOD5 ≤ 15 mg/l;
– COD ≤ 70 mg/l;
– Suspended solids ≤ 35 mg/l.
Scope of services:
- Preparation of technical design for WWTP for in parts:
– Technological;
– Structural;
– Outside connections – main water supply pipeline and discharge sewer;
– Electro and SKADA. - Deliveries of complete mechanical and technological equipment of MPSOV incl. electrical panel;
- Coordination of the project with the responsible institutions;
- Chief-assembling, start-up, and adjustment;
- Commissioning MWWTP;
- Technical coordination;
- Monitoring and control, including sampling and examination of the main parameters of the wastewater at the inlet and outlet flow parameters of the MWWTP.