Employer/ Beneficiary: AGROFRUIT – Troyan EOOD
Implementation period: 06/2004 – 08/2004
Design parameters:
- WWTP for industrial and communal wastewater from a factory for production of natural fruit pulps, clear concentrates and juices;
- WWTP capacity – 3 600 PE;
- Average daily wastewater quantity 70 ÷ 450 m³/d;
- Wastewater parameters:
– BOD5 = 400 ÷ 2 000 mg/l;
– COD = 400 ÷ 3 000 mg/l;
– NH4-N = 9 ÷ 25 mg/l.
Performed activities:
- Preparation of Preliminary Design and Technical Design in all design parts;
- Preparation of detailed BoQs;
- Coordination of the project with the relevant institutions;
- Supervision;
- Preparation of As-built documents;
- Commissioning.
Investment value of the project: 212 000 € (without VAT)