Employer/ Beneficiary: MUNICIPALITY OF MADZHAROVO
Implementation period: 06/2009 – 04/2014
Design parameters:
- Modular WWTP with capacity:
– Stage I: 330 PE;
– Stage II: 220 PE. - Outlet flow parameters WWTP:
– BOD5 ≤ 25 mg/l;
– COD ≤ 100 mg/l;
– Suspended solids ≤ 60 mg/l.
Scope of services:
- Preparation of technical design for parts:
– Technological;
– Structural;
– Electro and SKADA;
– Architecture;
– Heating, Ventilation & Air-conditioning and Energy Efficiency;
– Vertical planning and internal roads;
– Site Water Supply and Sewerage;
– Health and safety plan - Deliveries of complete mechanical and technological equipment incl. electrical panel for stage I: 330 PE ;
- Chief-assembling;
- Start-up, adjustment, and commissioning