PRELIMINARY DESIGN FOR INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT FROM PAPER FACTORY – “MAYR-MELINHOF NIKOPOL” AD

By 0
303
PRELIMINARY DESIGN FOR INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT FROM PAPER FACTORY – “MAYR-MELINHOF NIKOPOL” AD

Employer/ Beneficiary: MAYR-MELINHOF NIKOPOL AD
Implementation period: 10/2009 – 11/2009

Design parameters:

  • Treatment of mixed industrial and domestic wastewater from paper factory;
  • Qav.d = 14 508 m³/d

Performed activities:

  • Preparation of a program for quantity and quality wastewater determination from the paper factory;
  • Preliminary Design with 2 options of technology for the treatment of industrial and domestic wastewater;
  • Option analysis;
  • BoQ elaboration and cost estimates.