Employer/ Beneficiary: “MONTAZHI CO” EOOD/ SOFIA MUNICIPALITY by concessioner „SOFIYSKA VODA “AD Implementation period: 05.2023– 07/2023 Design parameters: Modernization of the existing automatic system for air supply to the aeration…
Category: References
References

"SUPPLYING THE KOSTINBROD PRODUCTION CENTER WITH WATER FROM EXISTING DRILLING WELLS (DW) – DW-3 AND DW-N AND RECONSTRUCTION OF THE EXISTING STORMWATER SEWERAGE NETWORK ON THE SITE /COLLECTOR/ AND OIL SEPARATOR"
By delphineco0Employer/ Beneficiary: Coca-Cola Hellenic Bottling Company S.A. Bulgaria Implementation period: 12.2022– 05/2023 Design parameters: Water supply pipeline from DW-N to PS to a fire-fighting tank with a length of L…

REGIONAL FEASIBILITY STUDIES (RFS) FOR DESIGNATED TERRITORIES SERVED BY NEWLY CONSOLIDATED WSS OPERATORS IN SIX LOTS: LOT 5 RFS FOR „WATER SUPPLY AND SEWERAGE OPERATOR – TARGOVISHTE “LTD, ACCORDING TO PUBLIC PROCUREMENT CONTRACT № РД 02-29-93/22.04.2021; DELPHIN PROJECT ECOTECHNICA LTD, PARTNER OF „YANTRA-VRANA “DZZD
By delphineco0Employer/ Beneficiary: MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS / MUNICIPALITY OF TARGOVISHTE Implementation period: 04/2021 – 04/2023 Design parameters: Development of technical and economic documentation, which to include –…

„RENOVATION (RECONSTRUCTION) OF WATER SUPPLY SYSTEM „MATNITSA“ – FIRST STAGE – RENOVATION OF BPS № 5, SECTION OF PRESSURE PIPELINES FROM BPS № 5 TO COLLECTING CHAMBER 6, 260 M FROM COLLECTING CHAMBER 6 TO INTAKE TANK, CONSTRUCTION OF A WATER SUPPLY CONNECTION WITH A PRESSURIZED PIPELINE FROM SHAFT WELL FOR MATNITSA DISTRICT TO THE STORAGE TANK 100 M3 /FOR MATNITSA DISTRICT/“, MUNICIPALITY OF SHUMEN.
By delphineco0Employer/ Beneficiary: MUNICIPALITY OF SHUMEN / „Water Supply and Sewerage operator – Shumen“ Ltd Implementation period: 05/2021 – 12/2021 Design parameters: Construction/renovation of the existing borehole 5 of the Matnitsa…

POTABLE WATER TREATMENT PLANT OF THE CITY OF SLIVEN
By delphineco0Employer/ Beneficiary: MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS / MUNICIPALITY OF SLIVEN Implementation period: 03/2022 – 2024 Design parameters: PWTP capacity – 850 l/s; Performed activities: Activity 1: Review…

FEASIBILITY STUDY: ASSESSMENT OF THE RECONSTRUCTION AND MODERNIZATION OPPORTUNITIES OF THE INDUSTRIAL WASTE WATER TREATMENT PLANT OF VERILA SERVIS AD, TOWN OF SOFIA TECHNICAL DESIGN: PUMPING STATION FOR DOMESTIC AND INDUSTRIAL WASTEWATER
By delphineco0Employer/ Beneficiary: VERILA SURVICE AD Implementation period: 04/2007 – 06/2007 and 04/2008 – 06/2008 Design parameters: On the site of the factory are situated 16 industrial buildings with different production.…

FEASIBILITY STUDIES AND PRELIMINARY DESIGN FOR SITE: RECONSTRUCTION AND MODERNIZATION OF INDUSTRIAL WASTEWATER TREATMENT PLANT OF BALGARSKA SPIRTOVARNA KOMPANIYA AD, TOWN OF IHTIMAN
By delphineco0Employer/ Beneficiary: Bulgarian Distillery Company AD Implementation period: 02/2006 – 07/2006 Design parameters: Industrial wastewater treatment plant from ethanol production (from cereal fermentation) with following parameters of the wastewater: –…

RECONSTRUCTION AND MODERNIZATION OF WWTP FOR INDUSTRIAL AND DOMESTIC WASTEWATERS OF FACTORY AGROFRUIT – TROYAN EOOD
By delphineco0Employer/ Beneficiary: AGROFRUIT – Troyan EOOD Implementation period: 06/2004 – 08/2004 Design parameters: WWTP for industrial and communal wastewater from a factory for production of natural fruit pulps, clear concentrates…
FEASIBILITY STUDY FOR THE POSSIBILITIES OF WASTEWATER TREATMENT AND ASSESSMENT OF THE IMPACT FROM THEIR DISCHARGING FOR SITE SELECTION OF A SILICATE FACTORY
By delphineco0Employer/ Beneficiary: FCG POVVIK EAD Implementation period: 06/2017 – 08/2017 Design parameters: Planned production – 30 000 million tons of silicates, with the potential to increase the production in the…