"SUPPLYING THE KOSTINBROD PRODUCTION CENTER WITH WATER FROM EXISTING DRILLING WELLS (DW) – DW-3 AND DW-N AND RECONSTRUCTION OF THE EXISTING STORMWATER SEWERAGE NETWORK ON THE SITE /COLLECTOR/ AND OIL SEPARATOR"

Employer/ Beneficiary: Coca-Cola Hellenic Bottling Company S.A. Bulgaria Implementation period: 12.2022– 05/2023 Design parameters: Water supply pipeline from DW-N to PS to a fire-fighting tank with a length of L…

FEASIBILITY STUDIES AND PRELIMINARY DESIGN FOR SITE:  RECONSTRUCTION AND MODERNIZATION OF INDUSTRIAL WASTEWATER TREATMENT PLANT OF BALGARSKA SPIRTOVARNA KOMPANIYA AD, TOWN OF IHTIMAN

Employer/ Beneficiary: Bulgarian Distillery Company AD Implementation period: 02/2006 – 07/2006 Design parameters: Industrial wastewater treatment plant from ethanol production (from cereal fermentation) with following parameters of the wastewater: –…