Employer/ Beneficiary: VERILA SURVICE AD
Implementation period: 04/2007 – 06/2007 and 04/2008 – 06/2008
Design parameters:
- On the site of the factory are situated 16 industrial buildings with different production. The wastewater flows are separated to:
– Industrial wastewater – from the respective production (production of perfumes, greases, detergents, concrete products, etc.);
– Domestic wastewater;
– Stormwater; - Average daily wastewater flow – 58 m³/d.
Performed activities:
- Preparation of Feasibility Study (FS);
- Wastewater sampling and analysis;
- Pilot studies;
- Technical-economic analyses;
- Technical Design (TD) of Pumping Station for domestic and industrial wastewaters.
Investment value of the project: 435 000 € (without VAT)