„RENOVATION (RECONSTRUCTION) OF WATER SUPPLY SYSTEM „MATNITSA“ – FIRST STAGE – RENOVATION OF BPS № 5, SECTION OF PRESSURE PIPELINES FROM BPS № 5 TO COLLECTING CHAMBER 6, 260 M FROM COLLECTING CHAMBER 6 TO INTAKE TANK, CONSTRUCTION OF A WATER SUPPLY CONNECTION WITH A PRESSURIZED PIPELINE FROM SHAFT WELL FOR MATNITSA DISTRICT TO THE STORAGE TANK 100 M3 /FOR MATNITSA DISTRICT/“, MUNICIPALITY OF SHUMEN.

By 0
362
„RENOVATION (RECONSTRUCTION) OF WATER SUPPLY SYSTEM „MATNITSA“ – FIRST STAGE – RENOVATION OF BPS № 5, SECTION OF PRESSURE PIPELINES FROM BPS № 5 TO COLLECTING CHAMBER 6, 260 M FROM COLLECTING CHAMBER 6 TO INTAKE TANK, CONSTRUCTION OF  A WATER SUPPLY CONNECTION WITH A PRESSURIZED PIPELINE FROM SHAFT WELL FOR MATNITSA DISTRICT TO THE STORAGE TANK 100 M3 /FOR MATNITSA DISTRICT/“, MUNICIPALITY OF SHUMEN.

Employer/ Beneficiary: MUNICIPALITY OF SHUMEN / „Water Supply and Sewerage operator – Shumen“ Ltd
Implementation period: 05/2021 – 12/2021

Design parameters:

  • Construction/renovation of the existing borehole 5 of the Matnitsa water supply system, construction of a pressurized pipeline for potable water delivery with a maximum water flow rate Q = 11 l/s to a newly constructed (design) connection with an existing pressurized pipeline to the storage tank 100 m3 /Matnitsa district/ to ensure the continuity of water supply for the Mutnitsa district;

Performed activities:

  • Activity 1: Detailed design in all design parts;
  • Activity 2: Design supervision.