"SUPPLYING THE KOSTINBROD PRODUCTION CENTER WITH WATER FROM EXISTING DRILLING WELLS (DW) – DW-3 AND DW-N AND RECONSTRUCTION OF THE EXISTING STORMWATER SEWERAGE NETWORK ON THE SITE /COLLECTOR/ AND OIL SEPARATOR"

Employer/ Beneficiary: Coca-Cola Hellenic Bottling Company S.A. Bulgaria Implementation period: 12.2022– 05/2023 Design parameters: Water supply pipeline from DW-N to PS to a fire-fighting tank with a length of L…