Employer/ Beneficiary: Private institute for water technologies EOOD/ Sofiyska Voda AD Implementation period: 02/2013 – 07/2015 Design parameters: Practical proof of an innovative method for WWTP optimization; Increasing the capacity…
Day: January 17, 2020

ENGINEERING - DESIGN, DESIGN SUPERVISION AND EXECUTION OF CONSTRUCTION AND ASSEMBLY WORK RELATED TO THE PROJECT “DEMONSTRATION CENTER FOR LOCAL INSTALLATIONS (WWTP’S) AND TECHNOLOGIES FOR WASTE WATER TREATMENT”
By delphineco0Employer/ Beneficiary: CORECT OOD/ Municipality of Vratsa Implementation period: 11/2016 – 03/2017 Design parameters: Demonstration center including 6 pcs modular WWTPs, each with a capacity of 4 PE. Performed activities:…

CONSTRUCTION OF BIOLOGICAL STAGE WITH NITROGEN AND PHOSPHOROUS REMOVAL FOR WASTEWATER TREATMENT PLANT (WWTP) – SHUMEN
By delphineco0Employer/ Beneficiary: Building-Development Holding EOOD/ Municipality of Shumen Implementation period: 06/2014 – 04/2017 Design parameters: The project include: – Partial reconstruction the mechanical stage and construction of: – Biological stage;…

REPAIR AND REPLACEMENT OF NON-FUNCTIONING WASTEWATER TREATMENT FACILITIES FOR HIGH MOUNTAIN SPORTS COMPLEX (NATIONAL SPORTS BASE) VSK – BELMEKEN, PAZARDZHIK PROVINCE
By delphineco0Employer/ Beneficiary: BatPEL OOD/ National Sports Base EAD Implementation period: 08/2011 – 10/2011 Design parameters: 3 pcs. modular WWTPs for domestic wastewater, each with a capacity of 110 PE; Outlet…

Modular waste water treatment plant below 100 PE
By delphineco0Year of implementation: Employer Name of project PE 2003 INTRAMA INVEST EOOD Modular waste water treatment plant for site: Workshop for ready-made clothes of “INTRAMA INVEST” EOOD 40 PE 2006…

FEASIBILITY STUDY FOR CONSTRUCTION OF INDUSTRIAL WWTP FOR AROMA AD
By delphineco0Employer/ Beneficiary: AROMA AD Implementation period: 11/2006 – 04/2017 Design parameters: WWTP for industrial wastewater from cosmetics and perfumery production; Average daily flow of 175 m³/d. Wastewater parameters: – COD…

FEASIBILITY STUDIES AND DESIGN OF SEWERAGE SYSTEM AND WWTP OF “BALKANPHARMA – DUPNITSA” AD
By delphineco0Employer/ Beneficiary: Balkanpharma – Dupnitsa AD Implementation period: 10/2003 – 02/2004 Design parameters: Site sewerage systems (domestic, industrial and storm water) on area of 38 420 ha; WWTP for industrial…

CONSTRUCTION OF BIOLOGICAL STAGE WITH NITROGEN AND PHOSPHOROUS REMOVAL FOR WASTEWATER TREATMENT PLANT (WWTP) – SHUMEN
By delphineco0Employer/ Beneficiary: Building-Development Holding EOOD/ Municipality of Shumen Implementation period: 06/2014 – 04/2017 Design parameters: The project include: Partial reconstruction the mechanical stage and construction of: – Biological stage; –…

ENGINEERING WITH SUBJECT: “DESIGN, CONSTRUCTION AND COMMISSIONING OF A NEW DIGESTER – 7 000 m³”
By delphineco0Employer/ Beneficiary: SADE – Compagnie Generale de Travaux Hydrauliques/ Municipality of Sofia via concessioner “Sofiyska voda” AD Implementation period: 08/2018 – at present Design parameters: Anaerobic digester with volume 7…