Employer/ Beneficiary: BatPEL OOD/ National Sports Base EAD
Implementation period: 08/2011 – 10/2011
Design parameters:
- 3 pcs. modular WWTPs for domestic wastewater, each with a capacity of 110 PE;
- Outlet flow parameters WWTP:
– BOD5 ≤ 25 mg/l;
– COD ≤ 125 mg/l;
– Suspended solids ≤ 35 mg/l;
– TN ≤ 15 mg /l;
– TP ≤ 2 mg /l.
Scope of services:
- Preparation of technical design for MPSOV in parts:
– Technological;
– Geodesy;
– Structural;
– Electro and SKADA;
– Health and safety plan. - Delivery of machinery and technological equipment (3 pcs. of modular WWTPs, 2 pcs. measuring devices at the MWWTP output, 2 pcs. of oil separation, automatic dosing stations);
- Chief-assembling, start-up and adjustment of the delivered 3 lines of the WWTP;
- Commissioning of 3 lines of WWTPs.
Investment value of the project: 286 324 € (without VAT)