Employer/ Beneficiary: Balkanpharma – Dupnitsa AD
Implementation period: 10/2003 – 02/2004
Design parameters:
- Site sewerage systems (domestic, industrial and storm water) on area of 38 420 ha;
- WWTP for industrial wastewater from the production of medicines and antibiotics;
Performed activities:
- Feasibility study; quantity and quality of wastewater;
- Data collection, analysis and assessment of existing infrastructure (38 420 ha);
- Preliminary survey of the production site for more than 10 industrial buildings;
- Preliminary design of WWTP and sewerage system on sites in 3 options, options analysis;
- Detailed design of separate sewerage system;
- Development of an investment program;
Investment value of the project: 1 840 000 € (without VAT)