Employer/ Beneficiary: SADE – Compagnie Generale de Travaux Hydrauliques/ Municipality of Sofia via concessioner “Sofiyska voda” AD Implementation period: 08/2018 – 12/2020 Design parameters: Anaerobic digester with volume 7 000…
Day: January 17, 2020
CONSTRUCTION OF WWTP FOR OVER 10 000 PE, RECONSTRUCTION AND COMPLETION OF THE SEWERAGE SYSTEM FOR TOWN OF LEVSKI
By delphineco0Employer/ Beneficiary: Municipality of Levski Implementation period: 11/2012 – 02/2014 Design parameters: WWTP capacity of 12 300 PE, with nitrogen and phosphorus removal and discharge into a “sensitive zone” water…
DESIGN OF A SYSTEM FOR DISCHARGE OF WASTEWATER FROM NEUTRALIZATION CHAMBERS TO WARM CHANNEL 2, NUCLEAR POWER PLANT - KOZLODUY
By delphineco0Employer/ Beneficiary: “VAON” EOOD/ State enterprise “Radioactive wastes” (SE RAW) Implementation period: 12/2017 – 10/2018 Design parameters: The system for discharge of wastewater from Neutralization Chambers to Warm Channel 2…
MUNICIPALITY INFRASTRUCTURE DEVELOPMENT PROJECT MIDP-D-QCBS-1: “SITE INVESTIGATION, DETAILED DESIGN AND BIDDING DOCUMENTS FOR LUDA YANA DAM” LOT 1: TECHNICAL ACTIVITIES ON INVESTIGATION, ANALYSIS AND DESIGN OF THE LUDA YANA DAM AND POTABLE WATER TREATMENT PLANT (PWTP) LOT 3: TECHNICAL ACTIVITIES ON INVESTIGATION AND DESIGN OF WATER SUPPLY PIPELINES FROM THE PWTP TO THE WATER SUPPLY NETWORK OF THE TOWN OF PANAGYURISHTE
By delphineco0Employer/ Beneficiary: JV for the design of the dam “Luda Yana” D. Karavokiris and Associates Consulting Engineers SA, Edafos Consulting Engineers SA/ Ministry of Regional Development and Public Works Implementation…
POTABLE WATER TREATMENT PLANT FOR WATER SUPPLY SYSTEM SHOUMEN
By delphineco0Employer/ Beneficiary: “Build invest – N” EOOD/ Shumen Municipality Implementation period: 11/2016 – 09/2017 Design parameters: PWTP with capacity of 600 l/s; Pumping station for treated water; External connections: power…
FEASIBILITY STUDY ELABORATION, PREPARATION OF INVESTMENT PROJECTS (PHASE PRELIMINARY DESIGN) FOR WWTP CONSTRUCTION AND RELATED TECHNICAL INFRASTRUCTURE; PREPARATION OF INVESTMENT PROJECTS (PHASE DETAILED DESIGN) FOR THE CITY OF ELHOVO’S WATER SUPPLY AND SEWERAGE NETWORKS AND SLUDGE MANAGEMENT PLAN
By delphineco0Employer/ Beneficiary: Municipality of Elhovo Implementation period: 08/2012 – 08/2015 Design parameters: WWTP capacity of 11 100 PE, with nitrogen and phosphorus removal and discharge into a “sensitive zone” water…
CONSTRUCTION OF WWTP FOR OVER 10 000 PE, RECONSTRUCTION AND COMPLETION OF THE SEWERAGE SYSTEM FOR TOWN OF LEVSKI
By delphineco0Employer/ Beneficiary: Municipality of Levski Implementation period: 11/2012 – 02/2014 Design parameters: WWTP capacity of 12 300 PE, with nitrogen and phosphorus removal and discharge into a “sensitive zone” water…