By Pallab GhoshScience correspondent, BBC News https://www.bbc.com/news/science-environment-49648746
Blog
In 2019, the UACG Hydraulic Engineering Faculty will celebrate 70 years since its establishment.
By delphineco0It is an approved and the only accredited institution in higher education for the training of masters and doctoral students and the awarding of diplomas in the field of water…
Research and DevelopmentPRACTICAL PROOF OF METHOD FOR OPTIMIZATION OF WASTE WATER TREATMENT PLANTS (WWTP) AND INCREASING THEIR ENERGY EFFICIENCY THROUGH THE SURVEY OF WWTP – SOFIA
By delphineco0Employer/ Beneficiary: Private institute for water technologies EOOD/ Sofiyska Voda AD Implementation period: 02/2013 – 07/2015 Design parameters: Practical proof of an innovative method for WWTP optimization; Increasing the capacity…
Research and DevelopmentTrainings and SeminarsENGINEERING - DESIGN, DESIGN SUPERVISION AND EXECUTION OF CONSTRUCTION AND ASSEMBLY WORK RELATED TO THE PROJECT “DEMONSTRATION CENTER FOR LOCAL INSTALLATIONS (WWTP’S) AND TECHNOLOGIES FOR WASTE WATER TREATMENT”
By delphineco0Employer/ Beneficiary: CORECT OOD/ Municipality of Vratsa Implementation period: 11/2016 – 03/2017 Design parameters: Demonstration center including 6 pcs modular WWTPs, each with a capacity of 4 PE. Performed activities:…
Communal WWTPEnergy Efficiency and RESSludge and Waste ManagementWaste Water Treatment PlantsCONSTRUCTION OF BIOLOGICAL STAGE WITH NITROGEN AND PHOSPHOROUS REMOVAL FOR WASTEWATER TREATMENT PLANT (WWTP) – SHUMEN
By delphineco0Employer/ Beneficiary: Building-Development Holding EOOD/ Municipality of Shumen Implementation period: 06/2014 – 04/2017 Design parameters: The project include: – Partial reconstruction the mechanical stage and construction of: – Biological stage;…
Small WWTP’sREPAIR AND REPLACEMENT OF NON-FUNCTIONING WASTEWATER TREATMENT FACILITIES FOR HIGH MOUNTAIN SPORTS COMPLEX (NATIONAL SPORTS BASE) VSK – BELMEKEN, PAZARDZHIK PROVINCE
By delphineco0Employer/ Beneficiary: BatPEL OOD/ National Sports Base EAD Implementation period: 08/2011 – 10/2011 Design parameters: 3 pcs. modular WWTPs for domestic wastewater, each with a capacity of 110 PE; Outlet…
Small WWTP’sModular waste water treatment plant below 100 PE
By delphineco0Year of implementation: Employer Name of project PE 2003 INTRAMA INVEST EOOD Modular waste water treatment plant for site: Workshop for ready-made clothes of “INTRAMA INVEST” EOOD 40 PE 2006…
Industrial WWTPWaste Water Treatment PlantsFEASIBILITY STUDY FOR CONSTRUCTION OF INDUSTRIAL WWTP FOR AROMA AD
By delphineco0Employer/ Beneficiary: AROMA AD Implementation period: 11/2006 – 04/2017 Design parameters: WWTP for industrial wastewater from cosmetics and perfumery production; Average daily flow of 175 m³/d. Wastewater parameters: – COD…
Industrial WWTPSewerage Networks and FacilitiesWaste Water Treatment PlantsFEASIBILITY STUDIES AND DESIGN OF SEWERAGE SYSTEM AND WWTP OF “BALKANPHARMA – DUPNITSA” AD
By delphineco0Employer/ Beneficiary: Balkanpharma – Dupnitsa AD Implementation period: 10/2003 – 02/2004 Design parameters: Site sewerage systems (domestic, industrial and storm water) on area of 38 420 ha; WWTP for industrial…
