Employer/ Beneficiary: Eco-Project 2000 OOD/ Municipalities of Pleven and Dolna Mitropoliya Implementation period: 12/2011 – 05/2013 Design parameters: Agglomeration of Pleven: – Reconstruction and modernization of WWTP with capacity of…
Category: References
References
Sewerage Networks and FacilitiesWater SupplySHUMEN WATER CYCLE IMPROVEMENTS IN BULGARIA, ISPA MEASURE – EUROPAID/120223/D/SV/BG TECHNICAL ASSISTANCE FOR WATER CYCLE SURVEY, DETAILED DESIGN, PREPARATION of WORK TENDER DOSSIER FOR CONSTRUCTION AND SUPERVISION OF THE CONSTRUCTION WORKS FOR SHUMEN WATER PROJECT
By delphineco0Employer/ Beneficiary: Consortium DIWI-IGIP-LOPP/ Municipality of Shumen Implementation period: 11/2007 – 01/2009 Design parameters: Water supply network – 61 km; Sewerage network – 22 km; Main water supply pipeline –…
International consulting servicesSewerage Networks and FacilitiesWater SupplyCHOCOLATE FACTORY WERGONA, GERMANY – FEASIBILITY STUDIES OF WATER SUPPLY NETWORK, DOMESTIC, INDUSTRIAL AND STORM WATER NETWORKS ON THE SITE OF THE FACTORY
By delphineco0Employer/ Beneficiary: SAB Sachverständigen und Architekturbüro Oldenburg/ Wergona Schokoladen GmbH, Germany Implementation period: 03/2018 – 09/2018 Design parameters: Area of the surveyed site – 97 639 m². Performed activities: Feasibility…
Sewerage Networks and FacilitiesWater SupplyREHABILITATION OF WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN – LOT 2 ADDITIONAL SECTIONS OF THE WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN
By delphineco0Employer/ Beneficiary: Municipality of Shumen Implementation period: 12/2009 – 02/2010 Design parameters: Sections from internal water supply network (incl. main water supply pipeline Ø 450 mm) with total length of…
Communal WWTPInternational consulting servicesWaste Water Treatment PlantsOPTIONS ANALYSIS FOR MODERNIZATION OF THE EXISTING WASTE WATER TREATMENT SYSTEM IN DIMITROVGRAD MUNICIPALITY, REPUBLIC OF SERBIA
By delphineco0Employer/ Beneficiary: Municipality of Dimitrovgrad, Republic of Serbia Implementation period: 08/2014 – 12/2014 Design parameters: WWTP capacity 11 113 PE and Qav.d = 2 450 m³/d; The existing biological step is…
Trainings and Seminars“DECENTRAL WASTE WATER MANAGEMENT IN BULGARIA”, A PILOT PROJECT FOR THE IDENTIFICATION OF THREE CITIES UNDER 2 000 PE (CHERNICHE, POLENA AND POLETO)
By delphineco0Employer/ Beneficiary: The Hessen Chamber of Engineers (IngKH), Germany Implementation period: 07/2010 – 11/2010 Project description: In 2005/2006, under the direction of the Ministry of Environment, Energy, Agriculture and Consumer…
Research and DevelopmentPRACTICAL PROOF OF METHOD FOR OPTIMIZATION OF WASTE WATER TREATMENT PLANTS (WWTP) AND INCREASING THEIR ENERGY EFFICIENCY THROUGH THE SURVEY OF WWTP – SOFIA
By delphineco0Employer/ Beneficiary: Private institute for water technologies EOOD/ Sofiyska Voda AD Implementation period: 02/2013 – 07/2015 Design parameters: Practical proof of an innovative method for WWTP optimization; Increasing the capacity…
Research and DevelopmentTrainings and SeminarsENGINEERING - DESIGN, DESIGN SUPERVISION AND EXECUTION OF CONSTRUCTION AND ASSEMBLY WORK RELATED TO THE PROJECT “DEMONSTRATION CENTER FOR LOCAL INSTALLATIONS (WWTP’S) AND TECHNOLOGIES FOR WASTE WATER TREATMENT”
By delphineco0Employer/ Beneficiary: CORECT OOD/ Municipality of Vratsa Implementation period: 11/2016 – 03/2017 Design parameters: Demonstration center including 6 pcs modular WWTPs, each with a capacity of 4 PE. Performed activities:…
Communal WWTPEnergy Efficiency and RESSludge and Waste ManagementWaste Water Treatment PlantsCONSTRUCTION OF BIOLOGICAL STAGE WITH NITROGEN AND PHOSPHOROUS REMOVAL FOR WASTEWATER TREATMENT PLANT (WWTP) – SHUMEN
By delphineco0Employer/ Beneficiary: Building-Development Holding EOOD/ Municipality of Shumen Implementation period: 06/2014 – 04/2017 Design parameters: The project include: – Partial reconstruction the mechanical stage and construction of: – Biological stage;…

