Our company Delphin Projekt Ecotechnica Ltd. has the ambition to consolidate its policies in the field of environment, resource efficiency and climate, as well as social, data protection and business ethics…
Blog

20-21 April 2021 - Workshop "Problems and solutions for the water sector in Bulgaria"
By delphineco0Dipl.-Eng. Krassimira Kuzmanova /Managing Director of the company/ participated as a moderator of session 2 – Water quality in the workshop “Green technologies meet the water sector in Bulgaria”, organized…

FEASIBILITY STUDY: ASSESSMENT OF THE RECONSTRUCTION AND MODERNIZATION OPPORTUNITIES OF THE INDUSTRIAL WASTE WATER TREATMENT PLANT OF VERILA SERVIS AD, TOWN OF SOFIA TECHNICAL DESIGN: PUMPING STATION FOR DOMESTIC AND INDUSTRIAL WASTEWATER
By delphineco0Employer/ Beneficiary: VERILA SURVICE AD Implementation period: 04/2007 – 06/2007 and 04/2008 – 06/2008 Design parameters: On the site of the factory are situated 16 industrial buildings with different production.…

FEASIBILITY STUDIES AND PRELIMINARY DESIGN FOR SITE: RECONSTRUCTION AND MODERNIZATION OF INDUSTRIAL WASTEWATER TREATMENT PLANT OF BALGARSKA SPIRTOVARNA KOMPANIYA AD, TOWN OF IHTIMAN
By delphineco0Employer/ Beneficiary: Bulgarian Distillery Company AD Implementation period: 02/2006 – 07/2006 Design parameters: Industrial wastewater treatment plant from ethanol production (from cereal fermentation) with following parameters of the wastewater: –…

RECONSTRUCTION AND MODERNIZATION OF WWTP FOR INDUSTRIAL AND DOMESTIC WASTEWATERS OF FACTORY AGROFRUIT – TROYAN EOOD
By delphineco0Employer/ Beneficiary: AGROFRUIT – Troyan EOOD Implementation period: 06/2004 – 08/2004 Design parameters: WWTP for industrial and communal wastewater from a factory for production of natural fruit pulps, clear concentrates…
FEASIBILITY STUDY FOR THE POSSIBILITIES OF WASTEWATER TREATMENT AND ASSESSMENT OF THE IMPACT FROM THEIR DISCHARGING FOR SITE SELECTION OF A SILICATE FACTORY
By delphineco0Employer/ Beneficiary: FCG POVVIK EAD Implementation period: 06/2017 – 08/2017 Design parameters: Planned production – 30 000 million tons of silicates, with the potential to increase the production in the…

PRELIMINARY DESIGN FOR INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT FROM PAPER FACTORY – “MAYR-MELINHOF NIKOPOL” AD
By delphineco0Employer/ Beneficiary: MAYR-MELINHOF NIKOPOL AD Implementation period: 10/2009 – 11/2009 Design parameters: Treatment of mixed industrial and domestic wastewater from paper factory; Qav.d = 14 508 m³/d Performed activities: Preparation…

TECHNICAL DESIGN, DELIVERY, CHIEF-ASSEMBLING, START-UP AND ADJUSTMENT OF WWTP FOR OBJECT: A DOOR MANUFACTURER WITH ADMINISTRATION IN THE LAND OF ELIN PELIN
By delphineco0Employer / Beneficiary: SOLID – 55 OOD Implementation period: 01/2008 – 10/2008 Design parameters: WWTP for industrial and domestic wastewater from a door manufacturing plant; Parameters of discharged treated water:…

RECONSTRUCTION AND MODERNIZATION OF EXISTING DAIRY, NEW BOILER ROOM, LOCAL WASTE WATER TREATMENT PLANT, OFFICE BUILDING WITH TASTING ROOM AND GARAGES – STAGE IMPLEMENTATION, BELOMORTSI VILLAGE, OMURTAG MUNICIPALITY
By delphineco0Employer/ Beneficiary: DAIRY PRODUCTSEOOD Veliko Tarnovo with O.P.S and Tukan EOOD Veliko Tarnovo Implementation period: 03/2018 – 05/2018 Design parameters: Local WWTP for Industrial and Domestic wastewater from a dairy…