"SUPPLYING THE KOSTINBROD PRODUCTION CENTER WITH WATER FROM EXISTING DRILLING WELLS (DW) – DW-3 AND DW-N AND RECONSTRUCTION OF THE EXISTING STORMWATER SEWERAGE NETWORK ON THE SITE /COLLECTOR/ AND OIL SEPARATOR"

Employer/ Beneficiary: Coca-Cola Hellenic Bottling Company S.A. Bulgaria Implementation period: 12.2022– 05/2023 Design parameters: Water supply pipeline from DW-N to PS to a fire-fighting tank with a length of L…

CHOCOLATE FACTORY WERGONA, GERMANY – FEASIBILITY STUDIES OF WATER SUPPLY NETWORK, DOMESTIC, INDUSTRIAL AND STORM WATER NETWORKS ON THE SITE OF THE FACTORY

Employer/ Beneficiary: SAB Sachverständigen und Architekturbüro Oldenburg/ Wergona Schokoladen GmbH, Germany Implementation period: 03/2018 – 09/2018 Design parameters: Area of the surveyed site – 97 639 m². Performed activities: Feasibility…

REHABILITATION OF WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN – LOT 2   ADDITIONAL SECTIONS OF THE WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN

Employer/ Beneficiary: Municipality of Shumen Implementation period: 12/2009 – 02/2010 Design parameters: Sections from internal water supply network (incl. main water supply pipeline Ø 450 mm) with total length of…