Employer/ Beneficiary: Coca-Cola Hellenic Bottling Company S.A. Bulgaria Implementation period: 12.2022– 05/2023 Design parameters: Water supply pipeline from DW-N to PS to a fire-fighting tank with a length of L…
Category: Sewerage Networks and Facilities
Sewerage Networks and Facilities
REGIONAL FEASIBILITY STUDIES (RFS) FOR DESIGNATED TERRITORIES SERVED BY NEWLY CONSOLIDATED WSS OPERATORS IN SIX LOTS: LOT 5 RFS FOR „WATER SUPPLY AND SEWERAGE OPERATOR – TARGOVISHTE “LTD, ACCORDING TO PUBLIC PROCUREMENT CONTRACT № РД 02-29-93/22.04.2021; DELPHIN PROJECT ECOTECHNICA LTD, PARTNER OF „YANTRA-VRANA “DZZD
By delphineco0Employer/ Beneficiary: MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS / MUNICIPALITY OF TARGOVISHTE Implementation period: 04/2021 – 04/2023 Design parameters: Development of technical and economic documentation, which to include –…
INTEGRATED WATER CYCLE, POMORIE, BURGAS REGION SITE 1: POMORIE WASTE WATER TREATMENT PLANT (WWTP) RECONSTRUCTION AND MODERNISATION SITE 2: POMORIE WATER SUPPLY AND SEWERAGE NETWORK RECONSTRUCTION AND REHABILITATION
By delphineco0Employer/ Beneficiary: Municipality of Pomorie Implementation period: 03/2012 – 08/2012 Design parameters: WWTP capacity of 56 626 PE (peak season) and 21 867 PE (off-peak season), with nitrogen and phosphorus…
INTEGRATED WATER CYCLE PLEVEN – DOLNA MITROPOLIYA
By delphineco0Employer/ Beneficiary: Eco-Project 2000 OOD/ Municipalities of Pleven and Dolna Mitropoliya Implementation period: 12/2011 – 05/2013 Design parameters: Agglomeration of Pleven: – Reconstruction and modernization of WWTP with capacity of…
SHUMEN WATER CYCLE IMPROVEMENTS IN BULGARIA, ISPA MEASURE – EUROPAID/120223/D/SV/BG TECHNICAL ASSISTANCE FOR WATER CYCLE SURVEY, DETAILED DESIGN, PREPARATION of WORK TENDER DOSSIER FOR CONSTRUCTION AND SUPERVISION OF THE CONSTRUCTION WORKS FOR SHUMEN WATER PROJECT
By delphineco0Employer/ Beneficiary: Consortium DIWI-IGIP-LOPP/ Municipality of Shumen Implementation period: 11/2007 – 01/2009 Design parameters: Water supply network – 61 km; Sewerage network – 22 km; Main water supply pipeline –…
CHOCOLATE FACTORY WERGONA, GERMANY – FEASIBILITY STUDIES OF WATER SUPPLY NETWORK, DOMESTIC, INDUSTRIAL AND STORM WATER NETWORKS ON THE SITE OF THE FACTORY
By delphineco0Employer/ Beneficiary: SAB Sachverständigen und Architekturbüro Oldenburg/ Wergona Schokoladen GmbH, Germany Implementation period: 03/2018 – 09/2018 Design parameters: Area of the surveyed site – 97 639 m². Performed activities: Feasibility…
REHABILITATION OF WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN – LOT 2 ADDITIONAL SECTIONS OF THE WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN
By delphineco0Employer/ Beneficiary: Municipality of Shumen Implementation period: 12/2009 – 02/2010 Design parameters: Sections from internal water supply network (incl. main water supply pipeline Ø 450 mm) with total length of…
FEASIBILITY STUDIES AND DESIGN OF SEWERAGE SYSTEM AND WWTP OF “BALKANPHARMA – DUPNITSA” AD
By delphineco0Employer/ Beneficiary: Balkanpharma – Dupnitsa AD Implementation period: 10/2003 – 02/2004 Design parameters: Site sewerage systems (domestic, industrial and storm water) on area of 38 420 ha; WWTP for industrial…
DESIGN OF A SYSTEM FOR DISCHARGE OF WASTEWATER FROM NEUTRALIZATION CHAMBERS TO WARM CHANNEL 2, NUCLEAR POWER PLANT - KOZLODUY
By delphineco0Employer/ Beneficiary: “VAON” EOOD/ State enterprise “Radioactive wastes” (SE RAW) Implementation period: 12/2017 – 10/2018 Design parameters: The system for discharge of wastewater from Neutralization Chambers to Warm Channel 2…