Employer/ Beneficiary: Coca-Cola Hellenic Bottling Company S.A. Bulgaria Implementation period: 12.2022– 05/2023 Design parameters: Water supply pipeline from DW-N to PS to a fire-fighting tank with a length of L…
Category: Sewerage Networks and Facilities
Sewerage Networks and Facilities
Communal WWTPDrinking Water Treatment PlantsReferencesSewerage Networks and FacilitiesWaste Water Treatment PlantsWater SupplyREGIONAL FEASIBILITY STUDIES (RFS) FOR DESIGNATED TERRITORIES SERVED BY NEWLY CONSOLIDATED WSS OPERATORS IN SIX LOTS: LOT 5 RFS FOR „WATER SUPPLY AND SEWERAGE OPERATOR – TARGOVISHTE “LTD, ACCORDING TO PUBLIC PROCUREMENT CONTRACT № РД 02-29-93/22.04.2021; DELPHIN PROJECT ECOTECHNICA LTD, PARTNER OF „YANTRA-VRANA “DZZD
By delphineco0Employer/ Beneficiary: MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS / MUNICIPALITY OF TARGOVISHTE Implementation period: 04/2021 – 04/2023 Design parameters: Development of technical and economic documentation, which to include –…
Communal WWTPSewerage Networks and FacilitiesSludge and Waste ManagementWater SupplyINTEGRATED WATER CYCLE, POMORIE, BURGAS REGION SITE 1: POMORIE WASTE WATER TREATMENT PLANT (WWTP) RECONSTRUCTION AND MODERNISATION SITE 2: POMORIE WATER SUPPLY AND SEWERAGE NETWORK RECONSTRUCTION AND REHABILITATION
By delphineco0Employer/ Beneficiary: Municipality of Pomorie Implementation period: 03/2012 – 08/2012 Design parameters: WWTP capacity of 56 626 PE (peak season) and 21 867 PE (off-peak season), with nitrogen and phosphorus…
Communal WWTPSewerage Networks and FacilitiesSludge and Waste ManagementWater SupplyINTEGRATED WATER CYCLE PLEVEN – DOLNA MITROPOLIYA
By delphineco0Employer/ Beneficiary: Eco-Project 2000 OOD/ Municipalities of Pleven and Dolna Mitropoliya Implementation period: 12/2011 – 05/2013 Design parameters: Agglomeration of Pleven: – Reconstruction and modernization of WWTP with capacity of…
Sewerage Networks and FacilitiesWater SupplySHUMEN WATER CYCLE IMPROVEMENTS IN BULGARIA, ISPA MEASURE – EUROPAID/120223/D/SV/BG TECHNICAL ASSISTANCE FOR WATER CYCLE SURVEY, DETAILED DESIGN, PREPARATION of WORK TENDER DOSSIER FOR CONSTRUCTION AND SUPERVISION OF THE CONSTRUCTION WORKS FOR SHUMEN WATER PROJECT
By delphineco0Employer/ Beneficiary: Consortium DIWI-IGIP-LOPP/ Municipality of Shumen Implementation period: 11/2007 – 01/2009 Design parameters: Water supply network – 61 km; Sewerage network – 22 km; Main water supply pipeline –…
International consulting servicesSewerage Networks and FacilitiesWater SupplyCHOCOLATE FACTORY WERGONA, GERMANY – FEASIBILITY STUDIES OF WATER SUPPLY NETWORK, DOMESTIC, INDUSTRIAL AND STORM WATER NETWORKS ON THE SITE OF THE FACTORY
By delphineco0Employer/ Beneficiary: SAB Sachverständigen und Architekturbüro Oldenburg/ Wergona Schokoladen GmbH, Germany Implementation period: 03/2018 – 09/2018 Design parameters: Area of the surveyed site – 97 639 m². Performed activities: Feasibility…
Sewerage Networks and FacilitiesWater SupplyREHABILITATION OF WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN – LOT 2 ADDITIONAL SECTIONS OF THE WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN
By delphineco0Employer/ Beneficiary: Municipality of Shumen Implementation period: 12/2009 – 02/2010 Design parameters: Sections from internal water supply network (incl. main water supply pipeline Ø 450 mm) with total length of…
Industrial WWTPSewerage Networks and FacilitiesWaste Water Treatment PlantsFEASIBILITY STUDIES AND DESIGN OF SEWERAGE SYSTEM AND WWTP OF “BALKANPHARMA – DUPNITSA” AD
By delphineco0Employer/ Beneficiary: Balkanpharma – Dupnitsa AD Implementation period: 10/2003 – 02/2004 Design parameters: Site sewerage systems (domestic, industrial and storm water) on area of 38 420 ha; WWTP for industrial…
Sewerage Networks and FacilitiesDESIGN OF A SYSTEM FOR DISCHARGE OF WASTEWATER FROM NEUTRALIZATION CHAMBERS TO WARM CHANNEL 2, NUCLEAR POWER PLANT - KOZLODUY
By delphineco0Employer/ Beneficiary: “VAON” EOOD/ State enterprise “Radioactive wastes” (SE RAW) Implementation period: 12/2017 – 10/2018 Design parameters: The system for discharge of wastewater from Neutralization Chambers to Warm Channel 2…