Employer/ Beneficiary: Municipality of Pomorie Implementation period: 03/2012 – 08/2012 Design parameters: WWTP capacity of 56 626 PE (peak season) and 21 867 PE (off-peak season), with nitrogen and phosphorus…
Category: Water Supply
Water Supply

INTEGRATED WATER CYCLE PLEVEN – DOLNA MITROPOLIYA
By delphineco0Employer/ Beneficiary: Eco-Project 2000 OOD/ Municipalities of Pleven and Dolna Mitropoliya Implementation period: 12/2011 – 05/2013 Design parameters: Agglomeration of Pleven: – Reconstruction and modernization of WWTP with capacity of…

SHUMEN WATER CYCLE IMPROVEMENTS IN BULGARIA, ISPA MEASURE – EUROPAID/120223/D/SV/BG TECHNICAL ASSISTANCE FOR WATER CYCLE SURVEY, DETAILED DESIGN, PREPARATION of WORK TENDER DOSSIER FOR CONSTRUCTION AND SUPERVISION OF THE CONSTRUCTION WORKS FOR SHUMEN WATER PROJECT
By delphineco0Employer/ Beneficiary: Consortium DIWI-IGIP-LOPP/ Municipality of Shumen Implementation period: 11/2007 – 01/2009 Design parameters: Water supply network – 61 km; Sewerage network – 22 km; Main water supply pipeline –…

CHOCOLATE FACTORY WERGONA, GERMANY – FEASIBILITY STUDIES OF WATER SUPPLY NETWORK, DOMESTIC, INDUSTRIAL AND STORM WATER NETWORKS ON THE SITE OF THE FACTORY
By delphineco0Employer/ Beneficiary: SAB Sachverständigen und Architekturbüro Oldenburg/ Wergona Schokoladen GmbH, Germany Implementation period: 03/2018 – 09/2018 Design parameters: Area of the surveyed site – 97 639 m². Performed activities: Feasibility…

REHABILITATION OF WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN – LOT 2 ADDITIONAL SECTIONS OF THE WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN
By delphineco0Employer/ Beneficiary: Municipality of Shumen Implementation period: 12/2009 – 02/2010 Design parameters: Sections from internal water supply network (incl. main water supply pipeline Ø 450 mm) with total length of…

FEASIBILITY STUDY ELABORATION, PREPARATION OF INVESTMENT PROJECTS (PHASE PRELIMINARY DESIGN) FOR WWTP CONSTRUCTION AND RELATED TECHNICAL INFRASTRUCTURE; PREPARATION OF INVESTMENT PROJECTS (PHASE DETAILED DESIGN) FOR THE CITY OF ELHOVO’S WATER SUPPLY AND SEWERAGE NETWORKS AND SLUDGE MANAGEMENT PLAN
By delphineco0Employer/ Beneficiary: Municipality of Elhovo Implementation period: 08/2012 – 08/2015 Design parameters: WWTP capacity of 11 100 PE, with nitrogen and phosphorus removal and discharge into a “sensitive zone” water…

CONSTRUCTION OF WWTP FOR OVER 10 000 PE, RECONSTRUCTION AND COMPLETION OF THE SEWERAGE SYSTEM FOR TOWN OF LEVSKI
By delphineco0Employer/ Beneficiary: Municipality of Levski Implementation period: 11/2012 – 02/2014 Design parameters: WWTP capacity of 12 300 PE, with nitrogen and phosphorus removal and discharge into a “sensitive zone” water…