COMPLETE TECHNICAL ASSISTANCE FOR PARTIAL CONSTRUCTION OF A SEWERAGE NETWORK WITH A WASTE WATER TREATMENT PLANT (WWTP) AND REHABILITATION OF THE EXISTING WATER SUPPLY NETWORK OF THE TOWN OF BELENE

Employer/ Beneficiary: Ivo Petrov – Architects OOD/ Municipality of Belene
Implementation period: 03/2010 – 09/2010

Design parameters:

  • WWTP capacity is 11 460 PE;
  • Average daily wastewater quantity of 1 550 m³/d;
  • Nitrogen and phosphorus removal and discharge into the Danube river – a “sensitive zone” water body;

Performed activities:

  • Preparation of Feasibility Study (FS);
  • Preliminary Design for WWTP of Belene (in two options);
  • Detailed Design:
    – For all design parts;
    – Bill of quantities;
    – O&M costs for MPSOV;
    – Determination of the cost price of 1 m³ treated water.
  • Coordination of the project between the different design parts;
  • Preparation of sludge management plan;
  • Preparation of tender documents for:
    – Construction of WWTP Belene;
    – Construction of the water supply and sewerage network Belene (16 km sewerage and 16 km water supply network)
    – Construction supervision.

Investment value of the project: 4 186 000 € (without VAT)

??????????????
??????????????