Employer/ Beneficiary: Ivo Petrov – Architects OOD/ Municipality of Belene
Implementation period: 03/2010 – 09/2010
Design parameters:
- WWTP capacity is 11 460 PE;
- Average daily waste water quantity of 1 550 m³/d;
- Nitrogen and phosphorus removal and discharge into the Danube river – a “sensitive zone” water body;
Performed activities:
- Preparation of Feasibility Study (FS);
- Preliminary Design for WWTP of Belene (in two options);
- Detailed Design:
– For all design parts;
– Bill of quantities;
– O&M costs for MPSOV;
– Determination of the cost price of 1 m3 treated water. - Coordination of the project between the different design parts;
- Preparation of sludge management plan;
- Preparation of tender documents for:
– Construction of WWTP Belene;
– Construction of the water supply and sewerage network Belene (16 km sewerage and 16 km water supply network)
– Construction supervision.
Investment value of the project: 4 186 000 € (without VAT)