REHABILITATION OF WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN – LOT 2   ADDITIONAL SECTIONS OF THE WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN

Employer/ Beneficiary: Municipality of Shumen
Implementation period: 12/2009 – 02/2010

Design parameters:

  • Sections from internal water supply network (incl. main water supply pipeline Ø 450 mm) with total length of 5,2 km (diameters Ø 110 ÷ 450 mm), construction of site pipelines with total length of 1,1 km and their household connections;
  • Sections from sewerage network with total length of 1,1 km (diameters Ø 300 ÷ 600 mm) and replacement of their household connections.

Performed activities:

  • Preparation of Technical Design by all design parts,
  • Budget documentation, detailed bill of quantities;
  • Design supervision.

Investment value of the project: 1 360 000 € (without VAT)