Employer/ Beneficiary: Municipality of Shumen
Implementation period: 12/2009 – 02/2010
Design parameters:
- Sections from internal water supply network (incl. main water supply pipeline Ø 450 mm) with total length of 5,2 km (diameters Ø 110 ÷ 450 mm), construction of site pipelines with total length of 1,1 km and their household connections;
- Sections from sewerage network with total length of 1,1 km (diameters Ø 300 ÷ 600 mm) and replacement of their household connections.
Performed activities:
- Preparation of Technical Design by all design parts,
- Budget documentation, detailed bill of quantities;
- Design supervision.
Investment value of the project: 1 360 000 € (without VAT)