Employer/ Beneficiary: SAB Sachverständigen und Architekturbüro Oldenburg/ Wergona Schokoladen GmbH, Germany
Implementation period: 03/2018 – 09/2018
Design parameters:
- Area of the surveyed site – 97 639 m².
Performed activities:
- Feasibility study, incl. surveys of existing building and site pipelines:
- Water supply networks;
- Sewerage (industrial, domestic and stormwater) networks;
- Installations on the territory of the factory.