INTEGRATED WATER CYCLE, POMORIE, BURGAS REGION   SITE 1: POMORIE WASTE WATER TREATMENT PLANT (WWTP) RECONSTRUCTION AND MODERNISATION  SITE 2: POMORIE WATER SUPPLY AND SEWERAGE NETWORK RECONSTRUCTION AND REHABILITATION

Employer/ Beneficiary: Municipality of Pomorie
Implementation period: 03/2012 – 08/2012

Design parameters:

  • WWTP capacity of 56 626 PE (peak season) and 21 867 PE (off-peak season), with nitrogen and phosphorus removal and deep-water discharge into a Black Sea – “sensitive zone”;
  • Preliminary design:
    – Water supply network with total length of 60 km;
    – Separate sewerage network (domestic and stormwater) with total length of 54 km;
    – Domestic sewerage pumping station – 1 pcs;
    – Stormwater pumping stations – 2 pcs.
  • Detailed design:
    – Water supply network with total length of 28 km;
    – Separate sewerage network (domestic and storm water) with total length of 42 km;
    – Domestic sewerage pumping station – 1 pcs;
    – Stormwater pumping stations – 2 pcs.

Performed activities:

  • Site 1: Feasibility study and preliminary design of WWTP with deep water discharge – 2 options, all design parts;
  • Site 2: Feasibility study and preliminary design for water supply and sewerage networks of Pomorie – 2 options, all design parts.

Investment value of the project: 45 731 000 € (without VAT)