Employer/ Beneficiary: Municipality of Pomorie
Implementation period: 03/2012 – 08/2012
Design parameters:
- WWTP capacity of 56 626 PE (peak season) and 21 867 PE (off-peak season), with nitrogen and phosphorus removal and deep-water discharge into a Black Sea – “sensitive zone”;
- Preliminary design:
– Water supply network with total length of 60 km;
– Separate sewerage network (domestic and stormwater) with total length of 54 km;
– Domestic sewerage pumping station – 1 pcs;
– Stormwater pumping stations – 2 pcs. - Detailed design:
– Water supply network with total length of 28 km;
– Separate sewerage network (domestic and storm water) with total length of 42 km;
– Domestic sewerage pumping station – 1 pcs;
– Stormwater pumping stations – 2 pcs.
Performed activities:
- Site 1: Feasibility study and preliminary design of WWTP with deep water discharge – 2 options, all design parts;
- Site 2: Feasibility study and preliminary design for water supply and sewerage networks of Pomorie – 2 options, all design parts.
Investment value of the project: 45 731 000 € (without VAT)