FEASIBILITY STUDY ELABORATION, PREPARATION OF INVESTMENT PROJECTS (PHASE PRELIMINARY DESIGN) FOR WWTP CONSTRUCTION AND RELATED TECHNICAL INFRASTRUCTURE; PREPARATION OF INVESTMENT PROJECTS (PHASE DETAILED DESIGN) FOR THE CITY OF ELHOVO’S WATER SUPPLY AND SEWERAGE NETWORKS AND SLUDGE MANAGEMENT PLAN

By 0
366
FEASIBILITY STUDY ELABORATION, PREPARATION OF INVESTMENT PROJECTS (PHASE PRELIMINARY DESIGN) FOR WWTP CONSTRUCTION AND RELATED TECHNICAL INFRASTRUCTURE; PREPARATION OF INVESTMENT PROJECTS (PHASE DETAILED DESIGN) FOR THE CITY OF ELHOVO’S WATER SUPPLY AND SEWERAGE NETWORKS AND SLUDGE MANAGEMENT PLAN

Employer/ Beneficiary: Municipality of Elhovo
Implementation period: 08/2012 – 08/2015

Design parameters:

  • WWTP capacity of 11 100 PE, with nitrogen and phosphorus removal and discharge into a “sensitive zone” water body;
  • Water supply network:
    – 40 km – preliminary design;
    – 3 km – detailed design.
  • Sewerage network:
    – 7 km – preliminary design;
    – 4 km – detailed design.

Performed activities:

  • Feasibility study and preliminary design for water supply and sewage networks and WWTP;
  • Detailed design for the linear infrastructure, incl. facilities;
  • Waste management plan, incl. Sludge;
  • Cost estimates;
  • Financial and economic analysis;
  • Design supervision.

Investment value of the project: 17 895 000 € (without VAT)