Employer/ Beneficiary: Municipality of Elhovo
Implementation period: 08/2012 – 08/2015
Design parameters:
- WWTP capacity of 11 100 PE, with nitrogen and phosphorus removal and discharge into a “sensitive zone” water body;
- Water supply network:
– 40 km – preliminary design;
– 3 km – detailed design. - Sewerage network:
– 7 km – preliminary design;
– 4 km – detailed design.
Performed activities:
- Feasibility study and preliminary design for water supply and sewage networks and WWTP;
- Detailed design for the linear infrastructure, incl. facilities;
- Waste management plan, incl. Sludge;
- Cost estimates;
- Financial and economic analysis;
- Design supervision.
Investment value of the project: 17 895 000 € (without VAT)