Employer/ Beneficiary: Municipality of Montana
Implementation period: 10/2007 – 11/2009
Design parameters:
- Inlet sewage collector 3293 m long and 1200 mm in diameter;
- WWTP with capacity of:
– 98 600 PE;
– Qav.d.= 17 840 m³/d; - Nitrogen and phosphorus removal and discharge into a “sensitive zone” water body;
- Discharge sewage collector, 232 m long and 1200 mm in diameter;
Performed activities:
- Managing, coordination, preparation of two-phase design by all design parts:
– Preliminary Design;
– Technical design;
– Detailed design;
– Issuing a construction permit; - Design supervision;
- Preparation of as-built documentation;
- Staff training;
- Assistance in start-up, adjustment, and commissioning;
Investment value of the project: 12 271 000 € (without VAT)