Employer/ Beneficiary: AQUA KARO 2014 DZZD/ Municipality Lovech Implementation period: 07/2014 – 07/2015 Design parameters: The treatment of wastewater from phosphorous contamination in WWTP Lovech is foreseen by the construction…
Year: 2020
Communal WWTPWaste Water Treatment PlantsENGINEERING WITH SUBJECT: DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF AN AUTOMATIC STATION FOR PREPARATION OF FLOCCULANT SOLUTION FOR 5 FILTERPRESS
By delphineco0Employer/ Beneficiary: Sofiyska voda AD Implementation period: 11/2017 – 12/2018 Design parameters: Automatic station for preparation of flocculant solution for servicing 5 pcs. filter presses, consisting of: – Big bag…
Communal WWTPWaste Water Treatment PlantsPREPARATION OF PRELIMINARY DESIGN FOR HOMOGENIZATION OF STABILIZED SLUDGE – WWTP KUBRATOVO, QUARTER BENKOVSKI, TOWN OF SOFIA
By delphineco0Employer/ Beneficiary: Sofiyska voda AD Implementation period: 08/2018 – 11/2018 Design parameters: Two existing sludge post-thickeners with (each of them with D = 40 m, H = 4,5 m, V…
Industrial WWTPInternational consulting servicesWaste Water Treatment PlantsFEASIBILITY STUDY OF THE POSSIBILITIES FOR OPTIMIZATION OF THE WASTEWATER TREATMENT PLANT FOR A POULTRY FACTORY KESKINOGLU - TURKEY
By delphineco0Employer/ Beneficiary: REMONDIS Su ve Atıksu Teknolojileri San. ve Tic. A.Ş. Implementation period: 12/2017 – 04/2018 Design parameters: WWTP for industrial wastewater from a poultry factory with a capacity of…
International consulting servicesSmall WWTP’sCOLLECTION AND TREATMENT OF WATER FROM TRUCK PARKING WITH PETROL STATION, MOTEL AND RESTAURANTS – GRABOV, GERMANY
By delphineco0Employer/ Beneficiary: SAB Sachverständigen und Architekturbüro Oldenburg, Germany Implementation period: 05/2017 – 07/2017 Design parameters: Water supply system; Separate sewage system (domestic and stormwater); Modular WWTP with a capacity of…
Energy Efficiency and RESCOMBINED ELECTRIC AND HEAT ENERGY PRODUCTION PLANT FROM RENEWABLE SOURCES – 3,5 MW
By delphineco0Employer/ Beneficiary: Stulz-Planaqua GmbH, Germany Implementation period: 05/2011 – 11/2011 Design parameters: Installation for the combined production of electricity and heat from corn silage (35 000 t/a) and the production…
Communal WWTPEnergy Efficiency and RESInternational consulting servicesSludge and Waste ManagementWaste Water Treatment PlantsWASTE WATER TREATMENT PLANT – KUMANOVO, NORTH MACEDONIA
By delphineco0Employer/ Beneficiary: Roediger AG Abwassertechnik/ Munchenstein – Switzerland/ Municipality of Kumanovo, Republic North Macedonia Implementation period: 04/2003 – 11/2007 Design parameters: WWTP with capacity of 91 330 PE; Nitrogen and…
Communal WWTPEnergy Efficiency and RESSludge and Waste ManagementWaste Water Treatment PlantsWASTE WATER TREATMENT PLANT KUBRATOVO (WWTP) – SOFIA – ANAEROBIC SLUDGE STABILIZATION PLANT (DIGESTERS)
By delphineco0Employer/ Beneficiary: Passavant-Roediger Anlagenbau GmbH – Germany/ Sofia Municipality by concessioner “Sofiyska voda” AD Implementation period: 04/2003 – 11/2009 Design parameters: Anaerobic Sludge Stabilization Plant with Biogas Utilization with following…
Communal WWTPSludge and Waste ManagementWaste Water Treatment PlantsMONTANA WASTEWATER TREATMENT PLANT, “PROJECT EUROPEAID/115678/D/W/BG – MONTANA WASTEWATER COLLECTION AND TREATMENT”
By delphineco0Employer/ Beneficiary: Municipality of Montana Implementation period: 10/2007 – 11/2009 Design parameters: Inlet sewage collector 3293 m long and 1200 mm in diameter; WWTP with capacity of: – 98 600…