Employer/ Beneficiary: METALSTROI OOD
Implementation period: 10/2018 – 04/2019
Design parameters:
- MWWTP to fast food restaurant with capacity 210 PE;
- Filter system with UV installation;
- Irrigation system with flow rate 3,6 m³/h;
Scope of services:
- Feasibility study;
- Choice of route for discharge collector after the MWWTP;
- Preparation of technical design for the parts:
– Technological;
– Structural;
– Electro and SKADA.