Employer/ Beneficiary: MUNICIPALITY OF SMOLYAN
Implementation period: 06/2009 – 04/2014
Design parameters:
- Modular WWTP with capacity 2538 PE and average daily waste water quantity of 388,31 m³/d;
- Outlet flow parameters WWTP:
– BOD5 ≤ 25 mg/l;
– COD ≤ 125 mg/l;
– Suspended solids ≤ 35 mg/l;
– pH = 6,0 – 8,5;
– TN ≤ 15 mg/l;
– TP ≤ 2 mg/l.
Scope of services:
- Feasibility studies for the technological part;
- Preparation of preliminary design for the technological part of the chosen MPSOV;
- Preparation of discharge permit documents.