REHABILITATION OF WASTE WATER TREATMENT PLANT (WWTP) ON ROADSIDE COMPLEX - PAZARDZHIK CITY

By 0
399

Employer/ Beneficiary: PAKO EOOD Company
Implementation period: 12/2001 – 03/2001

Design parameters:

  • Modular WWTP for domestic wastewater with average daily wastewater quantity of 26,5 m³/d;
  • Outlet flow parameters WWTP:
    – BOD5 ≤ 25 mg/l;
    – COD ≤ 125 mg/l;
    – Suspended solids ≤ 35 mg/l.

Scope of services:

  • Preparation of preliminary design of a new technological scheme and conversion of the treatment plant, according to updated data on parts:
    – Technological;
    – Architecture;
    – Structural;
    – Electro and SKADA;
    – Vertical planning and internal roads.
  • Preparation of detailed design for the rehabilitation of the existing WWTP – reconstruction, and modernization in parts:
    – Technological;
    – Architecture;
    – Structural;
    – Electro and SKADA;
    – Vertical planning and internal roads.
  • Design supervision;
  • Assistance in commissioning, start-up, and adjustment.