Employer/ Beneficiary: Private employer
Implementation period: 10/2005 – 02/2006

Design parameters:

  • Modular WWTP for domestic wastewater with capacity:
    – 600 PE;
    – Average daily wastewater quantity of 167.4 m³/d.

Scope of services:

  • Preparation of technical and detailed design for parts:
    – Technological;
    – Structural;
    – Outside connections – main water supply pipeline and discharge sewer;
    – Electro and SKADA;
    – Vertical planning and internal roads.
  • Preparation of documents for obtaining permission from the Regional Environmental And Water Inspection / Basin Directive for discharge of wastewater;
  • Project coordination with the relevant institutions to issue building permits.