MODULAR WASTE WATER TREATMENT PLANT FOR SITE: CAMPING SITE SOUTH, ON THE LAND OF VILLAGE OF LOZENETS

By 0
284
MODULAR WASTE WATER TREATMENT PLANT FOR SITE: CAMPING SITE SOUTH, ON THE LAND OF VILLAGE OF LOZENETS

Employer/ Beneficiary: IF FAVORIT OOD
Implementation period: 2005 – 2006

Design parameters:

  • Modular WWTP for domestic wastewater with capacity 220 PE and average daily wastewater quantity of 49,3 m³/d;
  • Outlet flow parameters WWTP:
    – BOD5 ≤ 25 mg/l;
    – COD ≤ 125 mg/l;
    – Suspended solids ≤ 60 mg/l.

Scope of services:

  • Technical design for reconstruction and modernization of existing WWTP;
  • Coordination of the project with the responsible institutions;
  • Deliveries of complete mechanical and technological equipment of MPSOV incl. electrical panel;
  • Chief-assembling, start-up, and adjustment;
  • Commissioning MWWTP;
  • Monitoring and control, including sampling and examination of the main parameters of the wastewater at the inlet and outlet flow parameters of the MWWTP.