Employer/ Beneficiary: Municipality of Venets
Implementation period: 04/2008 – 03/2009
Design parameters:
- WWTP with a capacity of 3 780 PE;
- Quantity of inlet wastewater Qav.d.= 383 m³/d;
- Nitrogen and phosphorous removal and discharge into a “sensitive zone” water body;
Performed activities:
- Preparation of Preliminary Design in two options by all design parts;
- BoQ, technical and economic analysis;
- Determination of operating costs and cost of 1 m³ treated water;
- Technical design;
Investment value of the project: 1 736 000 € (without VAT)