Employer/ Beneficiary: Municipality of Tutrakan
Implementation period: 08/2012 – 08/2015
Design parameters:
- WWTP has capacity of 10 500 PE;
- Average daily wastewater quantity of Q.= 1 930 m³/d;
- Nitrogen and phosphorus removal and discharge into Danube River – “sensitive zone”;
Performed activities:
- Feasibility Study incl. determination populace equivalence and wastewater quality and quantity;
- Preliminary design of Tutrakan WWTP I all design parts in two options, incl. evaluation of options;
- BoQ, determination of O&M costs and cost of 1 m³ treated water.
Investment value of the project: 7 363 000 € (without VAT)