ENGINEERING WITH SUBJECT: DESIGN, DELIVERY, INSTALLATION AND COMMISSIONING OF AN AUTOMATIC STATION FOR PREPARATION OF FLOCCULANT SOLUTION FOR 5 FILTERPRESS

Employer/ Beneficiary: Sofiyska voda AD Implementation period: 11/2017 – 12/2018 Design parameters: Automatic station for preparation of flocculant solution for servicing 5 pcs. filter presses, consisting of: – Big bag…

FEASIBILITY STUDY OF THE POSSIBILITIES FOR OPTIMIZATION OF THE WASTEWATER TREATMENT PLANT FOR A POULTRY FACTORY KESKINOGLU - TURKEY

Employer/ Beneficiary: REMONDIS Su ve Atıksu Teknolojileri San. ve Tic. A.Ş. Implementation period: 12/2017 – 04/2018 Design parameters: WWTP for industrial wastewater from a poultry factory with a capacity of…

COLLECTION AND TREATMENT OF WATER FROM TRUCK PARKING WITH PETROL STATION, MOTEL AND RESTAURANTS – GRABOV, GERMANY

Employer/ Beneficiary: SAB Sachverständigen und Architekturbüro Oldenburg, Germany Implementation period: 05/2017 – 07/2017 Design parameters: Water supply system; Separate sewage system (domestic and stormwater); Modular WWTP with a capacity of…

WASTE WATER TREATMENT PLANT – KUMANOVO, NORTH MACEDONIA

Employer/ Beneficiary: Roediger AG Abwassertechnik/ Munchenstein – Switzerland/ Municipality of Kumanovo, Republic North Macedonia Implementation period: 04/2003 – 11/2007 Design parameters: WWTP with capacity of 91 330 PE; Nitrogen and…

WASTE WATER TREATMENT PLANT KUBRATOVO (WWTP) – SOFIA – ANAEROBIC SLUDGE STABILIZATION PLANT (DIGESTERS)

Employer/ Beneficiary: Passavant-Roediger Anlagenbau GmbH – Germany/ Sofia Municipality by concessioner “Sofiyska voda” AD Implementation period: 04/2003 – 11/2009 Design parameters: Anaerobic Sludge Stabilization Plant with Biogas Utilization with following…