Blog

CHOCOLATE FACTORY WERGONA, GERMANY – FEASIBILITY STUDIES OF WATER SUPPLY NETWORK, DOMESTIC, INDUSTRIAL AND STORM WATER NETWORKS ON THE SITE OF THE FACTORY

Employer/ Beneficiary: SAB Sachverständigen und Architekturbüro Oldenburg/ Wergona Schokoladen GmbH, Germany Implementation period: 03/2018 – 09/2018 Design parameters: Area of the surveyed site – 97 639 m². Performed activities: Feasibility…

REHABILITATION OF WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN – LOT 2   ADDITIONAL SECTIONS OF THE WATER SUPPLY AND SEWERAGE NETWORKS OF TOWN OF SHUMEN

Employer/ Beneficiary: Municipality of Shumen Implementation period: 12/2009 – 02/2010 Design parameters: Sections from internal water supply network (incl. main water supply pipeline Ø 450 mm) with total length of…

OPTIONS ANALYSIS FOR MODERNIZATION OF THE EXISTING WASTE WATER TREATMENT SYSTEM IN DIMITROVGRAD MUNICIPALITY, REPUBLIC OF SERBIA

Employer/ Beneficiary: Municipality of Dimitrovgrad, Republic of Serbia Implementation period: 08/2014 – 12/2014 Design parameters: WWTP capacity 11 113 PE and Qav.d = 2 450 m³/d; The existing biological step is…

“DECENTRAL WASTE WATER MANAGEMENT IN BULGARIA”, A PILOT PROJECT FOR THE IDENTIFICATION OF THREE CITIES UNDER 2 000 PE (CHERNICHE, POLENA AND POLETO)

Employer/ Beneficiary: The Hessen Chamber of Engineers (IngKH), Germany Implementation period: 07/2010 – 11/2010 Project description: In 2005/2006, under the direction of the Ministry of Environment, Energy, Agriculture and Consumer…