Employer/ Beneficiary: MUNICIPALITY OF SHUMEN / „Water Supply and Sewerage operator – Shumen“ Ltd
Implementation period: 05/2021 – 12/2021
Design parameters:
- Construction/renovation of the existing borehole 5 of the Matnitsa water supply system, construction of a pressurized pipeline for potable water delivery with a maximum water flow rate Q = 11 l/s to a newly constructed (design) connection with an existing pressurized pipeline to the storage tank 100 m3 /Matnitsa district/ to ensure the continuity of water supply for the Mutnitsa district;
Performed activities:
- Activity 1: Detailed design in all design parts;
- Activity 2: Design supervision.