Employer/ Beneficiary: MUNICIPALITY OF BRATYA DASKALOVI
Implementation period: 04/2007 – 06/2007
Design parameters:
- Modular WWTP for domestic wastewater with capacity 108 PE and average daily wastewater quantity of 16,06 m³/d;
- Outlet flow parameters WWTP:
– BOD5 ≤ 25 mg/l;
– COD ≤ 150 mg/l;
– Suspended solids ≤ 35 mg/l.
Scope of services:
- Management of the project;
- Procedures on issuance of discharge permits;
- Detailed design;
- Coordination procedures;
- Design supervision;
- Deliveries of complete mechanical and technological equipment of MPSOV incl. electrical panel;
- Chief-assembling, start-up, and adjustment;
- Commissioning MWWTP;
- Technical coordination;
- Monitoring and control, including sampling and examination of the main parameters of the wastewater at the inlet and outlet flow parameters of the MWWTP.