Employer/ Beneficiary: ET “Marin Kitanov”
Implementation period: 03/2003 – 04/2004
Design parameters:
- Construction of a modern sports center according to the requirements of FINA:
– Gym;
– Tennis court;
– Olympic size swimming pool – 8 corridors;
– Competition stands; - Pool dimensions L = 50 m, B = 25 m
- Volume of the pool 2400 m³
- Recirculated water quantity 600 m³/h
- Rapid sand filter 3 pcs.
Performed activities:
- Detailed design – all design parts;
- Technical coordination, issuing of construction permit;
- Elaboration of bidding documents; Tendering;
- Supervision during the construction works.
Investment value of the project: 153 390 € (without VAT)