DESIGN SPORT COMPLEX WITH OLYMPIC SWIMMING POOL, REGISTERED IN THE REQUIREMENTS OF FINA

By 0
378
DESIGN SPORT COMPLEX WITH OLYMPIC SWIMMING POOL, REGISTERED IN THE REQUIREMENTS OF FINA

Employer/ Beneficiary: ET “Marin Kitanov”
Implementation period: 03/2003 – 04/2004

Design parameters:

  • Construction of a modern sports center according to the requirements of FINA:
    – Gym;
    – Tennis court;
    – Olympic size swimming pool – 8 corridors;
    – Competition stands;
  • Pool dimensions L = 50 m, B = 25 m
  • Volume of the pool 2400 m³
  • Recirculated water quantity 600 m³/h
  • Rapid sand filter 3 pcs.

Performed activities:

  • Detailed design – all design parts;
  • Technical coordination, issuing of construction permit;
  • Elaboration of bidding documents; Tendering;
  • Supervision during the construction works.

Investment value of the project: 153 390 € (without VAT)