Reconstruction and modernization of existing dairy, new Boiler room, local waste water treatment plant, office building with Tasting room and Garages – stage implementation, Belomortsi village, Omurtag Municipality

Employer/ Beneficiary: DAIRY PRODUCTSEOOD Veliko Tarnovo with O.P.S and Tukan EOOD Veliko Tarnovo
Implementation period: 03/2018 – 05/2018

Design parameters:

  • Local WWTP for Industrial and Domestic wastewater from a dairy farm producing “halou” grill cheese.
  • Production capacity of the dairy – 30 t / d milk.
  • Main parameters of the inlet wastewater:
    – COD 6 000 mg/l;
    – BOD5 3 000 mg/l;
    – Suspended solids 1 500 mg/l;
    – N total 170 mg/l;
    – P total 50 mg/l;
    – Wastewater average daily flow 74 m³/d.

Performed activities:

  • Preparation of Preliminary Design;
  • Technical Design in all design parts;
  • Bill of quantities and valuation of the investment costs for the local WWTP.

Investment value of the project: 250 000 € (without VAT)