Feasibility study: assessment of the reconstruction and modernization opportunities of the industrial waste water treatment plant of Verila Servis AD, town of Sofia Technical Design: pumping station for domestic and industrial wastewater

Employer/ Beneficiary: VERILA SURVICE AD
Implementation period: 04/2007 – 06/2007 and 04/2008 – 06/2008

Design parameters:

  • On the site of the factory are situated 16 industrial buildings with different production. The wastewater flows are separated to:
    – Industrial wastewater – from the respective production (production of perfumes, greases, detergents, concrete products, etc.);
    – Domestic wastewater;
    – Stormwater;
  • Average daily wastewater flow – 58 m³/d.

Performed activities:

  • Preparation of Feasibility Study (FS);
  • Wastewater sampling and analysis;
  • Pilot studies;
  • Technical-economic analyses;
  • Technical Design (TD) of Pumping Station for domestic and industrial wastewaters.

Investment value of the project: 435 000 € (without VAT)