Domestic and industrial waste water treatment from the territory of the Magura winery, Rabisha village, Belogradchik Municipality, Vidin Province

Employer/ Beneficiary: Magura AD Winery
Implementation period: 08/2011 – 12/2011

Design parameters:

  • WWTP for domestic and industrial wastewater treatment from the territory of a winery;
  • WWTP capacity – 320 PE.

Performed activities:

  • Feasibility study;
  • Bill of quantities by aggregate indicators;
  • Determination of the investment intent;
  • Preparation of documentation for a discharge permit.

Investment value of the project: 153 000 € (without VAT)

Waste Water Treatment PlantsIndustrial WWTP