Chocolate factory Wergona, Germany – feasibility studies of water supply network, domestic, industrial and storm water networks on the site of the factory

Employer/ Beneficiary: SAB Sachverständigen und Architekturbüro Oldenburg/ Wergona Schokoladen GmbH, Germany
Implementation period: 03/2018 – 09/2018

Design parameters:

  • Area of the surveyed site – 97 639 m².

Performed activities:

  • Feasibility study, incl. surveys of existing building and site pipelines:
  • Water supply networks;
  • Sewerage (industrial, domestic and stormwater) networks;
  • Installations on the territory of the factory.