„Renovation (reconstruction) of water supply system „Matnitsa“ – First stage – renovation of BPS № 5, section of pressure pipelines from BPS № 5 to collecting Chamber 6, 260 m from collecting Chamber 6 to Intake tank, construction of a water supply connection with a pressurized pipeline from shaft well for Matnitsa district to the Storage Tank 100 M3 /for Matnitsa DISTRICT/“, Municipality of Shumen.

Employer/ Beneficiary: MUNICIPALITY OF SHUMEN / „Water Supply and Sewerage operator – Shumen“ Ltd
Implementation period: 05/2021 – 12/2021

Design parameters:

  • Construction/renovation of the existing borehole 5 of the Matnitsa water supply system, construction of a pressurized pipeline for potable water delivery with a maximum water flow rate Q = 11 l/s to a newly constructed (design) connection with an existing pressurized pipeline to the storage tank 100 m3 /Matnitsa district/ to ensure the continuity of water supply for the Mutnitsa district;

Performed activities:

  • Activity 1: Detailed design in all design parts;
  • Activity 2: Design supervision.

Water Supply