"SUPPLYING THE KOSTINBROD PRODUCTION CENTER WITH WATER FROM EXISTING DRILLING WELLS (DW) – DW-3 AND DW-N AND RECONSTRUCTION OF THE EXISTING STORMWATER SEWERAGE NETWORK ON THE SITE /COLLECTOR/ AND OIL SEPARATOR"

By 0
154
"SUPPLYING THE KOSTINBROD PRODUCTION CENTER WITH WATER FROM EXISTING DRILLING WELLS (DW) – DW-3 AND DW-N AND RECONSTRUCTION OF THE EXISTING STORMWATER SEWERAGE NETWORK ON THE SITE /COLLECTOR/ AND OIL SEPARATOR"

Employer/ Beneficiary: Coca-Cola Hellenic Bottling Company S.A. Bulgaria

Implementation period: 12.2022– 05/2023

Design parameters:

  • Water supply pipeline from DW-N to PS to a fire-fighting tank with a length of L = 464 m and a diameter of DN 100;
  • Reconstruction of existing stormwater sewerage network on the site in the section from existing manhole (EM) 1 to EM 10 and reconstruction of the discharge sewer collector from EM 10 to the point of discharge. Total length of the reconstructed sewerage network L = 477 m with diameters DN 700 and DN 1100;
  • Replacement of 2 pcs. existing oil separators with 1 pc. new oil separator – dimensioning, details.

Performed activities:

  • Activity 1: Technical design for supplying the Kostinbrod production center with water from existing drilling wells, according to Ordinance No. 4/21.05.2001 on the scope and the content of investment projects in all design parts;
  • Activity 2: Coordination of the project documentation for all design parts with the relevant control authorities, operating companies and institutions, as well as removal of possible remarks during the coordination of the projects with the relevant control authorities, operating companies and institutions;
  • Activity 3: Technical design for moving of two power lines crossing the property of CCHBC in Kostinbrod, along the periphery of the property, according to Ordinance No. 4/21.05.2001 on the scope and the content of investment projects in all design parts.