Employer/ Beneficiary: “MONTAZHI CO” EOOD/ SOFIA MUNICIPALITY by concessioner „SOFIYSKA VODA “AD Implementation period: 05.2023– 07/2023 Design parameters: Modernization of the existing automatic system for air supply to the aeration…
Category: Communal WWTP
Communal WWTP

REGIONAL FEASIBILITY STUDIES (RFS) FOR DESIGNATED TERRITORIES SERVED BY NEWLY CONSOLIDATED WSS OPERATORS IN SIX LOTS: LOT 5 RFS FOR „WATER SUPPLY AND SEWERAGE OPERATOR – TARGOVISHTE “LTD, ACCORDING TO PUBLIC PROCUREMENT CONTRACT № РД 02-29-93/22.04.2021; DELPHIN PROJECT ECOTECHNICA LTD, PARTNER OF „YANTRA-VRANA “DZZD
By delphineco0Employer/ Beneficiary: MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS / MUNICIPALITY OF TARGOVISHTE Implementation period: 04/2021 – 04/2023 Design parameters: Development of technical and economic documentation, which to include –…

EXPERIMENTAL WASTE WATER TREATMENT PLANT WITH MOVABLE WALL – SINEMORETS
By delphineco0Employer/ Beneficiary: Municipality of Tsarevo Implementation period: 2000 – 2003 Design parameters: WWTP capacity – 1 500 PE Qav.d.= 133 m³/d Qmax.h.= 10 m³/h BOD5= 81 kg/d Innovative element: The…

EXPERIMENTAL WASTE WATER TREATMENT PLANT WITH MOVABLE WALL – VARVARA
By delphineco0Employer/ Beneficiary: Municipality of Tsarevo Implementation period: 2000 – 2003 Design parameters: WWTP capacity – 800 PE Qav.d.= 133 m³/d Qmax.h.= 10 m³/h BOD5= 81 kg/d Innovative element: The chosen…

WASTE WATER TREATMENT PLANT – YASENKOVO
By delphineco0Employer/ Beneficiary: Municipality of Venets Implementation period: 04/2008 – 03/2009 Design parameters: WWTP with a capacity of 3 780 PE; Quantity of inlet wastewater Qav.d.= 383 m³/d; Nitrogen and phosphorous…

OPTIMIZATION OF THE BIOLOGICAL STAGE OF RUSE WWTP
By delphineco0Employer/ Beneficiary: Water Supply and Sanitation Operator OOD, Ruse Implementation period: 01/2015 – 05/2015 Design parameters: WWTP capacity of 240 000 PE; WWTP inlet parameters: – Average daily amount 52…

FEASIBILITY STUDIES FOR WATER SUPPLY NETWORKS, DRINKING WATER TREATMENT PLANTS (DWTP’S), SEWERAGE, WASTEWATER TREATMENT PLANTS (WWTP’S) AND SOLID WASTE MANAGEMENT FOR BANSKO AND SANDANSKI
By delphineco0Employer/ Beneficiary: Infrasystem OOD, Germany Implementation period: 11/2004 – 04/2005 Design parameters: Feasibility studies for water supply networks, drinking water treatment plants (DWTP’s), sewerage, wastewater treatment plants (WWTP’s) and solid…

FEASIBILITY STUDIES FOR SEWERAGE NETWORKS AND WASTEWATER TREATMENT PLANTS FOR THE TOWNS OF KARDZHALI AND ASENOVGRAD
By delphineco0Employer/ Beneficiary: „SAEM Sofia” Ltd., Bulgaria Implementation period: 10/2003 – 04/2004 Design parameters: Preliminary survey for the sewerage system and WWTP for the town of Kardzhali; Preliminary survey for the…

COMPLETE TECHNICAL ASSISTANCE FOR PARTIAL CONSTRUCTION OF A SEWERAGE NETWORK WITH A WASTE WATER TREATMENT PLANT (WWTP) AND REHABILITATION OF THE EXISTING WATER SUPPLY NETWORK OF THE TOWN OF BELENE
By delphineco0Employer/ Beneficiary: Ivo Petrov – Architects OOD/ Municipality of Belene Implementation period: 03/2010 – 09/2010 Design parameters: WWTP capacity is 11 460 PE; Average daily wastewater quantity of 1 550…