MODULAR WASTE WATER TREATMENT PLANT (MWWTP) FOR VILLAGE OF TIMAREVO – 2 298 PE, HITRINO MUNICIPALITY

By 0
457

Employer/ Beneficiary: Municipality of Hitrino

Implementation period: 01/2011 – 02/2011

Design parameters:

  • Modular WWTP for domestic wastewater village Timarevo with capacity 2 298 PE;
  • Outlet flow parameters WWTP:
    – BOD5 ≤ 25 mg/l;
    – COD ≤ 125 mg/l;
    -Suspended solids ≤ 35 mg/l.

Scope of services:

  • Preparation of preliminary design in two comparable variants on all design parts;
  • Bill of quantities by aggregate indicators;
  • Technical and economic comparison of options;
  • Determination of the cost price of treated water.

Investment value of the project: 1 753 800 € (without VAT)